Abstract

This paper analyses production operations and scheduling constraints on a wafer probe centre in semiconductor manufacturing. Such actions as lot split and hot lot preemption are discussed. Due to the combinatorial difficulties of scheduling problems with sequence-dependent setup costs and multiple criteria, a humancomputer interactive scheduler named the 'interactive computer aided scheduling system' (ICASS) is proposed. This ICASS can search for schedules to achieve a specific performance level set by a human. An experiment was conducted on a wafer probe centre to compare the performance of ICASS with that of a manual approach and six priority rules. The results indicate that ICASS spent less scheduling time and provided better schedules than the manual approach. All the six priority rules yielded only poor schedules with unbalanced performance in three kinds of criteria, although they were beneficial in computation time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.