Abstract

This paper proposes a new method based Cuckoo Search Algorithm (CSA) to investigate the optimal capacitor placement and sizing from the reliability point of view. In this regard, System Average Interruption Frequency Index (SAIFI) and System Average Interruption Duration Index (SAIDI) as the customer-orientated indices and Average Energy Not Supplied (AENS) as the load and energy-orientated index are utilized as the reliability objective functions. Meanwhile, to reach a compromise between the original objective functions and reliability ones, the total system cost including the MW cost of power losses as well as the capacitor investment cost is also considered as an objective function. In order to handle the proposed nonlinear constraint multi-objective optimization problem suitably, a new self adaptive modification method based on Cuckoo Search Algorithm (CSA) is proposed. The feasibility and effectiveness of the proposed method is investigated through a standard test system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.