Abstract

The development of wind power generation has rapidly progressed over the last decade. With the advancement in wind turbine technology, wind energy has become competitive with other fuel-based resources. The fluctuation of wind, however, makes it difficult to optimize the usage of wind power. The current practice ignores wind generation capacity in the unit commitment (UC), which discounts its usable capacity and may cause operational issues when the installation of wind generation equipment increases. To ensure system reliability, the forecasting uncertainty must be considered in the incorporation of wind power capacity into generation planning. This paper discusses the development of an artificial-neural-network-based wind power forecaster and the integration of wind forecast results into UC scheduling considering forecasting uncertainty by the probabilistic concept of confidence interval. The data from a wind farm located in Lawton City, OK, is used in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.