Abstract

This paper deals with the location assignment and storage/retrieval scheduling problem simultaneously in multi-shuttle automated storage/retrieval systems. Both the situations of performing a single operation cycle and multiple operation cycles are considered. Two related models, including an integer programming model and a dynamic programming model, are developed to formulate the problem. A two-phase tabu search algorithm is proposed to solve the integer programming model for the situation of performing a single operation cycle. Based on the search results, a construction heuristic is developed to improve the solution for the situation of performing multiple operation cycles. The computational results show that the two-phase tabu search algorithm can find better solutions than GA + MNN methods especially for the large-sized problems. In addition, it reveals that the construction heuristic can also significantly improve the quality of the solution for the situation of performing multiple operation cycles.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call