Abstract

Assembly line balancing and sequencing are two main problems in the planning of a mixed-model assembly line. In recent years, the un-paced buffered mixed-model assembly line with buffers between workstations has been widely used in industry. In order to solve the balancing and sequencing problem and ensure the efficient operation of the assembly line, an integrated method for the balancing and sequencing of unpaced buffered mixed-model assembly line is proposed. A combined precedence diagram is used to transform the mixedmodel assembly line balancing problem into a single model balancing problem. The objective of the balancing problem is to minimize cycle time under given the number of the workstations. A combined priority rule is adopted to find a solution. Based on the result of the balancing problem, the NEH (Nawaz-Enscore-Ham) algorithm is implemented for the sequencing problem to minimize the makespan considering the blocking owing to the buffers. The effectiveness of the method is verified by three cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.