Abstract

This paper proposes an integrated job shop scheduling and assembly sequence planning (IJSSASP) approach for discrete manufacturing, enabling the part processing sequence and assembly sequence to be optimized simultaneously. The optimization objectives are to minimize the total production completion time and the total inventory time of parts during production. The interaction effects between the job shop schedule and the assembly sequence plan in discrete manufacturing are analyzed, and the mathematical models including the objective functions and the constraints are established for IJSSASP. Based on the above, a non-dominated sorting genetic algorithm-II (NSGA-Ⅱ) with a hybrid chromosome coding mechanism is applied to solve the IJSSASP problem. Through the case studies and comparison tests for different scale problems, the proposed IJSSASP approach is verified to be able to improve the production efficiency and save the manufacturing cost of the discrete manufacturing enterprise more effectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.