Abstract

A multi-mode resource-constrained project scheduling problem (MRCPSP) with multiple skills is investigated in this paper. Unlike the traditional form of this problem, and considering the real-world project circumstances, project activities can be preempted. In this paper, a new multi-objective mixed-integer linear programming (MILP) model with three objective functions is extended. These objectives are: (1) minimizing the project makespan, (2) minimizing the total resource costs, and (3) minimizing the total project risk. Based on real-life projects, non-renewable resources are represented as an uncertain stochastic parameter. To cope with the uncertain environment, chance-constrained programming with a confidence level is considered. A real-world construction project of a sports center in Tehran is utilized to demonstrate the applicability of the presented formulation. A well-known lexicographic optimization method, namely AUGMECON2, is applied to solve the proposed formulation with three objectives. Ultimately, for the case study and two datasets J30 and MM50, the proposed lexicographic optimization algorithm is compared with an efficient multi-objective mathematical programming technique known as the AUGMECON method. The comparison is based on performance metrics (i.e., IGD and HV) commonly used in multi-objective optimization. The results show the relative dominance of the proposed lexicographic optimization algorithm over the AUGMECON method in all sizes of the problem instances.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call