Abstract
A key factor to a successful layout design is the allocation of the limited buffer space between the work cells of a production line. Based on a closed-form solution, this paper presents an algorithm for the optimum allocation of buffer stocks in flexible transfer lines. The analysis assumes the availability of a general storage area (central buffer), where blocked jobs can be kept until needed. Although the algorithm is devloped for Markovian systems, it has been found applicable also to non-Markovian ones.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.