Abstract
With the development of building materials manufacturing enterprises, the ordering, transportation and storage of raw materials have become important factors affecting the production of manufacturing enterprises. In order to ensure the normal production and operation activities and reduce the production cost as much as possible, enterprises need to reasonably adjust the relevant raw material ordering scheme and transportation scheme to ensure both the considerable production efficiency and the healthy and sustainable production. In this paper, a mathematical model based on sequential heuristic algorithm and integer programming is established to develop the most economical ordering scheme and the least lossy transportation scheme for raw materials in the process of production operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.