Abstract
This paper presents an incentive scheme to encourage investment in the improvement and expansion of the transmission in the competitive electricity market environment. To create these incentives, a decentralized transmission asset investment model is proposed, where the new assets are built by the investors. The incentives are based on the value added to the social welfare through each asset investment. By viewing each potential investor as a player in a cooperative game the Shapley value is used to reward investors according to the added value that they create. The proposed methodology is applied to the Garver 6-bus system and the IEEE 24-bus Reliability Test System to illustrate the capability and flexibility of the decision support system presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.