Abstract

A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers, distributed optical fibre strain sensors, and borehole pressure cells (BHPCs). The instrumentation spanned across a 15.24 m lengthwise segment of the relatively massive granitic pillar situated at a depth of 2.44 km within the mine. Between May 2016 and March 2017, the pillar's displacement and pressure response were measured and correlated with mining activities on the same level as the pillar, including: (1) mine-by of the pillar, (2) footwall drift development, and (3) ore body stoping operations. Regarding displacements of the pillar, the extensometers provided high temporal resolution (logged hourly) and the optical fibre strain sensors provide high spatial resolution (measured every 0.65 mm along the length of each sensor). The combination of sensing techniques allowed centimetre-scale rock mass bulking near the pillar sidewalls to be distinguished from microstrain-scale fracturing towards the core of the pillar. Additionally, the influence and extent of a mine-scale schistose shear zone transecting the pillar was identified. By converting measured rock mass displacement to velocity, a process was demonstrated which allowed mining activities inducing displacements to be categorised by time-duration and cumulative displacement. In over half of the analysed mining activities, displacements were determined to prolong for over an hour, predominately resulting in submillimetre cumulative displacements, but in some cases multi-centimetre cumulative displacements were observed. This time-dependent behaviour was more pronounced within the vicinity of the plumb shear zone. Displacement measurements were also used to assess selected support member load and elongation mobilisation per mining activity. It was found that a combined static load and elongation capacity of reinforcing members was essential to maintaining excavation stability, while permitting gradual shedding of stress through controlled pillar sidewall displacements.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call