Abstract
Abstract This paper explores the impulse equivalent method for constructing voltage source converter (VSC) model in large power grids containing multiple converters. It addresses the challenge of simulation cycle mismatch with device switching moments and proposes a cross-cycle correction method. The method enhances the VSC electromagnetic transient (EMT) simulation model, making it suitable for large-scale power grid simulations. The approach is validated through case studies, confirming its accuracy and computational efficiency for complex power electronic networks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.