Abstract

An improvement heuristic algorithm is proposed in this paper for solving flow shop scheduling problem (Fm / prmu / Cmax). To test its efficiency, firstly the performance of the proposed algorithm is done against the six heuristics existing in the literature including the best NEH heuristic on 120 Taillard benchmarks. Further, this set of 120 Taillard instances is increased to 266 benchmark problem instances which include Carlier's, some Reeves and some new hard VRF instances from Vallada et al. (2015). On these instances, the performance of the proposed algorithm is tested against the best NEH and the famous CDS heuristic with the best known upper bounds. Further, a brief analysis of the other heuristics and metaheuristics existing in literature is done on Taillard problem instances. The proposed heuristic outperforms all the heuristics reported in this paper.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call