Abstract

Flexible manufacturing systems (FMSs) are nowadays installed in the mechanical industry. In such systems, many different part types are produced simultaneously and it is necessary to take tooling constraints into account for finding an optimal schedule. A heuristic method is presented for solving the m-machine, n-job shop scheduling problem with tooling constraints. This method, named TOMATO, is based on an adaptation of tabu search techniques and is an improvement on the JEST algorithm proposed by Widmer in 1991.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.