Abstract

According to the nuclear regulations and industry standards, the trip setpoint and allowable value for the plant protection system have been determined by considering design basis events. In order to improve the safety of a nuclear power plant, an attempt has been made to develop an improved setpoint determination methodology for the plant protection system trip parameter considering not only a design basis event but also a beyond design basis event. The results of a quantitative evaluation performed for the Advanced Power Reactor 1400 nuclear power plant in Korea are presented herein. The results confirmed that the proposed methodology is able to improve the nuclear power plant's safety by determining more reasonable setpoints that can cover beyond design basis events.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.