Abstract

High-speed railway (HSR) presents the characteristics of a heavy load, large traction current, and ballastless track-bed. As the 'neural network' of the signalling system, the line-side signal cable may threaten both human safety and control information transmission for an HSR operation when interfered with by a strong traction current. This study comprehensively investigates the electromagnetic interference (EMI) factors of the traction power supply system (TPSS) and the integrated earthing system (IES) to a signal cable and completes the electromagnetic coupling mechanism analysis of longitudinal electromotive force (LEF). Then, an improved theoretical calculation method is proposed for the multi-conductor power line network of the HSR instead of the traditional look-up table method. Regarding the essential influence of different earthing methods and cable laying conditions, the quantitative calculation of the LEF on the cable is evaluated. The validity of the theoretical method is verified through finite element simulation. Finally, the solutions to suppress the EMI are put forward for cable laying. This work provides an accurate quantitative basis for the implementation of the on-site LEF test, is significant for the design of cable laying schemes in railway engineering, and is also beneficial to ensure the safe operation of HSR.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.