Abstract

This paper deals with the two-stage hybrid flow shop problem , in which the first stage consists of three machines , the second stage consists of two machines . The aim is to find out the optimal scheduling for n jobs when processing in this environment when the makespan is minimum. Therefore we propose a particle swarm algorithm which consists of a new procedure to calculate the makespan and a new stopping criteria .Also, we added improvement to the proposed algorithm , by using one of the components of the genetic algorithm (crossover operation) in order to obtain initial swarm particles instead of random obtaining. After applying the two algorithms on several problems which were generated randomly by uniform distribution , the results showed that the improved proposed particle swarm algorithm was the best in finding out the optimal scheduling for jobs and in cpu time to reach the solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.