Abstract
This paper formulates a bi-criteria fuzzy blocking flow shop scheduling problem with fuzzy processing time and fuzzy due date. An improved multi-objective grey wolf optimization (MOGWO) algorithm is proposed to solve this combinational optimization problem. The proposed MOGWO utilizes the ranked-order-value (ROV) rule for solution representation, employs a dynamic maintenance strategy to maintain archive, and develops a thorough mechanism for leader selection. In addition, to improve the performance of the neighborhood search, a VNS structure with three randomly ranked neighborhood search operators is introduced and implemented on the members of archive that may become the selected leaders. The proposed MOGWO is tested on a fuzzy blocking flow shop scheduling problem of panel block construction, and is compared with general MOGWO and multi-objective particle swarm optimization (MOPSO). Computational results suggest that the proposed MOGWO is superior to the compared algorithms in terms of the convergence, spread and coverage of the optimal solutions. This demonstrates the feasibility and effectiveness of the proposed MOGWO.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.