Abstract

In this paper, we deal with the two-machine flow shop scheduling problem having an unavailability interval on the first machine, and nonresumable jobs. We first present an enhancement procedure that, once applied to any arbitrary solution, produces a schedule that is at most equal 2 times the optimal makespan. We then develop an improved heuristic, with a relative worst-case error of 3/2.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.