Abstract
An improved heuristic is proposed for one-machine scheduling problem with delay constraints, thus an open problem raised by Wikumet al. is solved. The heuristic solves the corresponding unit-execution-time problem optimally.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have