Abstract

Process planning and scheduling are two of the most important functions involved in manufacturing process and they are actually interrelated; integration of the two is essential to improve the flexibility of scheduling and achieve a global improvement for the performance of a manufacturing system. In order to facilitate the optimization of process planning and scheduling simultaneously, a mathematical model for the integrated process planning and scheduling (IPPS) is established, and an improved genetic algorithm (IGA) is proposed for the problem. For the performance improvement of the algorithm, new initial selection method for process plans, new genetic representations for the scheduling plan combined with process plans and genetic operator method are developed. To verify the feasibility and performance of the proposed approach, experimental studies are conducted and comparisons are made between this approach and others with the makespan and mean flow time performance measures. The results show that the proposed approach on IPPS has achieved significant improvement in minimizing makespan and obtained good results for the mean flow time performance measure with high efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.