Abstract

In this paper the problem of directional overcurrent relays coordination in interconnected power networks is presented and solved using the optimization theory. Linear programming with Simplex two-phase method is applied to minimize the operating time of the relays. The insignificance of weighting factors and far-end fault consideration in the problem formulation is proved, through a mathematical example, by simulation, mathematically, graphically and by sensitivity analysis. The current transformer (CT) selection is achieved based on the maximum load and fault currents in order to prevent the miscoordination problem resulting from CT's saturation. A complete algorithm for calculating the optimal operating times is introduced and applied to sample examples.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.