Abstract

This paper presents a new branch and bound procedure for scheduling a flow-line manufacturing cell. This procedure and an existing procedure are tested on several problem sets with varying numbers of families, jobs and machines, and varying setup time distributions. The results show that the new procedure solves small problems dramatically faster than the existing procedure. Three heuristic procedures, based on the new branch and bound procedure, are developed. These heuristic procedures as well as a tabu search procedure are tested on problem sets with larger problem sizes. The results show that one of the new procedures generates solutions with improved makespans compared to the tabu search procedure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call