Abstract

This article investigates identical parallel machines scheduling with family setup times. The objective function being the weighted sum of completion times, the problem is known to be strongly NP-hard. We propose a constructive heuristic algorithm and three complementary lower bounds. Two of these bounds proceed by elimination of setup times or by distributing each of them to jobs of the corresponding family, while the third one is based on a lagrangian relaxation. The bounds and the heuristic are incorporated into a branch-and-bound algorithm. Experimental results obtained outperform those of the methods presented in previous works, in term of size of solved problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.