Abstract

In this paper, we discuss the one-machine scheduling problem with release and delivery times with the minimum makespan objective. Both heuristics and branch-and-bound algorithms have been formulated for the problem. One such branch-and-bound algorithm solves the problem and a variation that requires a delay between the completion of one job and the start of another (delayed precedence constraints). This paper analyzes key components of this branch-and-bound algorithm and proposes an improved heuristic to be used in conjunction with a different search strategy. Computational experiments demonstrate that the modifications lead to substantial improvements in running time and number of iterations on the one-machine problem instances both with and without delayed precedence constraints.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.