Abstract

With the advent of deep sub-micron era, there is a demand to consider the design closure problem in high-level synthesis. It is well known that the slack is an effective means of tolerating the uncertainties in operation delays. Previous work ever attempted to increase the usable slack based on a given initial schedule. Instead of the post-processing approach, this paper is the first attempt to the simultaneous application of operation scheduling and slack optimization. We use a 0-1 integer linear programming (0-1 ILP) approach to formally formulate the problem. Under the design constraints (timing and resource), our approach is applicable to two different objective functions: the maximization of the total usable slack and the maximization of the number of non-zero slack operations. Compared with previous work, our approach has the following two advantages: first, our approach guarantees the optimality; second, our approach is more suitable for the design space exploration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.