Abstract
This paper describes an external system equivalent for on-line generator outage simulation. The equivalent models the steady- state MW response of the external system after primary speed control actions. The proposed method is an extension to the Ward equivalent. Starting with the frequency response characteristics of the individual units and loads in the external system, equivalent frequency response characteristics for each boundary bus have been developed. These equivalent frequency response characteristics model not only the total in-rush, but also the distribution among the individual tie lines. In addition to the data required for branch outage simulations the incremental speed regulations and rated powers of all external units on the line are assumed to be known. No real-time measurement data from the external control areas are required. The suggested equivalent has been verified by off-line simulations of 10 severe generator outages in three European 380/220 kV networks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.