Abstract

Purpose – Rework is known to contribute to waste and value losses in building design and construction. Studies estimate its magnitude between 2 and 25 per cent of construction contract sums. Rework‐related waste could, however, be higher if the whole life cycle of building facilities is considered. Rework occurrences are increasing in Uganda and yet the National Development Plan 2010/11 – 14/15 intends to construct additional public buildings. With insufficient information regarding rework causality and magnitude, wastage arising from rework during the implementation of the National Development Plan could be substantial. The problem of rework occurrence in Uganda will require determining rework causality and magnitude. This paper seeks to address these issues.Design/methodology/approach – An exploratory study on rework in public building construction was undertaken through a case study to understand its causality and the timeframe over which it occurs. This preliminary research is characteristically quali...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call