Abstract

Production planning models that aim at determining optimal release schedules for production facilities face a fundamental circularity. In order to match supply to demand in an optimal manner, they must recognize the cycle time that elapses between material being released into the plant and its emergence as finished product. However, it is well known from queuing models that the mean cycle time increases nonlinearly with resource utilization, which is determined by the release schedule. To address this circularity, a number of authors have suggested algorithms which iterate between a linear programming model that determines releases for a set of flow time estimates, and a simulation model that evaluates the production realized from that release schedule. We present computational experiments examining the behavior of two such algorithms. We find that the convergence behavior of one is significantly more consistent than that of the other, and explore insights that may lead to improved algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.