Abstract

A description is given of a long-range power system expansion planning program which incorporates three significant features. First, it is an optimizing program and uses dynamic programming for tracking an optimal expansion strategy. Second, it contains a rule-based decision making mechanism to incorporate engineering judgment based on design office experience and expert opinions. Third, since some of these considerations have to be cast in qualitative terms and need to balance many conflicting requirements, fuzzy set theory has been used to formulate a portion of the decision making procedure.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.