Abstract

For buried municipal tunnels—such as cable tunnels and utility tunnels with structural defects—due to the sheltering of the internal pipelines, shelves, and other auxiliary facilities, traditional trenchless rehabilitating methods are not applicable since an intact ring is needed for spraying and lining. In these tunnels, only the exposed area at the crown of the ring can be partly rehabilitated. In this paper, three-edge bearing tests (TEBTs) for partially rehabilitated reinforced concrete (RC) pipe sections are carried out to simulate the case of a municipal tunnel and the effects of different repair materials (cement mortar and epoxy resin) and different dimensional parameters of the liner (lining thickness, lining range) on the partial rehabilitation effect of defective RC pipes are studied. The deforming compatibility of the liner–pipe interface is discussed, and the flexural rigidity of the partially rehabilitated section is calculated. The results show that the load-carrying capacities of partial rehabilitated RC pipes are effectively improved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call