Abstract

Engineering site and shaft pillars are excavated to prolong the life of collieries and excavate more underground coal. The Jinggezhuang colliery (‘JGZ’) is a resource-exhausted coal mine in eastern China. It was determined that the industrial site and shaft pillar of JGZ would be extracted in 2008. This study excavated an experimental panel to examine the effect of pillar excavation on surface buildings in complicated geological conditions. A new pillar design was proposed based on surface monitoring to increase the recovery ratio. To maintain the safety of the shaft and engineering facilities, panel 0091 was mined and surface deformation was monitored during the experiment. The deformation characteristics and parameters were obtained using a back analysis method. A new pillar was designed using the parameters measured from panel 0091. The design maintained the safety of the shaft but relaxed the restriction of the influence of constructions at the engineering site. The prediction results of the surface subsidence and the deformation of the main building were analyzed. The maximum subsidence of the surface was 7419 mm, but the surface subsidence of the shafts was less than 10 mm. The shafts were weakly influenced by the pillar excavation. The prediction results can be used as basic information for the monitoring and maintenance of buildings in the future. Using the new pillar design, 2.54 million tons of coal resources were mined. This study provides an engineering example and a reference for shaft pillar excavation in the future.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call