Abstract
The article presents the results of an experiment we conducted with database professionals in order to evaluate an approach to automatic design of the initial conceptual database model based on collaborative business process models. The source business process model is represented by BPMN, while the target conceptual model is represented by the UML class diagram. The results confirm those already obtained in a case-study-based evaluation, as well as those of an earlier controlled experiment conducted with undergraduate students. The evaluation implies that the proposed approach and implemented generator enable automatic generation of the target conceptual model with a high percentage of completeness and precision. The experiment also confirms that the automatically generated model can be efficiently used as a starting point for manual design of the target model, since it significantly shortens the estimated efforts and actual time spent to obtain the target model in contrast to the manual design from scratch.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.