Abstract

In this paper, an expanded optimal control policy is proposed to study the coupled tanks system, where the random disturbance is added into the system. Since the dynamics of the coupled tanks system can be formulated as a nonlinear system, determination of the optimal water level in the tanks is useful for the operation decision. On this point of view, the coupled tanks system dynamics is usually linearized to give the steady state operating height. In our approach, a model-based optimal control problem, which is adding with adjusted parameters, is considered to obtain the true operating height of the real coupled tanks system. During the computation procedure, the differences between the real plant and the model used are measured repeatedly, where the optimal solution of the model used is updated. On this basis, system optimization and parameter estimation are integrated. At the end of the iteration, the iterative solution approximates to the correct optimal solution of the original optimal control problem, in spite of model-reality differences. In conclusion, the efficiency of the approach proposed is shown.

Highlights

  • A coupled tanks system, which consists of a joint of two tanks together through pipes in order to reserve water at the operating height level, is an important study in the control engineering and process industries [1]

  • Since the dynamics of the coupled tanks system can be formulated as a nonlinear system, determination of the optimal water level in the tanks is useful for the operation decision

  • The use of the expanded optimal control policy in determining the operating height level in the coupled tanks system was discussed in this paper

Read more

Summary

Introduction

A coupled tanks system, which consists of a joint of two tanks together through pipes in order to reserve water at the operating height level, is an important study in the control engineering and process industries [1]. The inflow and the outflow of the coupled tanks system are monitored in a simulation way in which the balance between the change rate of the water height level and the water flow in and out can be measured precisely. The water flow rate shall be controlled such that the equilibrium of the steady state along the operating height level is established. See for more detail in [4] [5] [6]

Methods
Findings
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call