Abstract

It is shown that the Quick Switching System, Tightened Normal Tightened Scheme and other switching systems emerge from the generalised two‐plan system involving normal and tightened inspection. The corresponding operating characteristic (OC) functions are also shown to emerge from generalised results. The performance of different systems is compared with reference to their OC curves. The possibility of being applied in a critical area of application (in which the single sampling plans are not possible to apply) is indicated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.