Abstract

In this paper we propose an exact algorithm for the Resource Constrained Project Scheduling Problem (RCPSP) with generalized precedence relationships (GPRs) and minimum makespan objective. For the RCPSP with GPRs we give a new mathematical formulation and a branch and bound algorithm exploiting such a formulation. The exact algorithm takes advantage also of a lower bound based on a Lagrangian relaxation of the same mathematical formulation. We provide an extensive experimentation and a comparison with known lower bounds and competing exact algorithms drawn from the state of the art.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call