Abstract
AbstractA network design problem which arises in the distribution of a public utility provided by several competitive suppliers is studied. The problem addressed is that of determining minimum‐cost (generalized) arc capacities in order to accommodate any demand between given source–sink pairs of nodes, where demands are assumed to fall within predetermined ranges. Feasible flows are initially considered as simply bounded by the usual arc capacity constraints. Then, more general linear constraints are introduced which may limit the weighted sum of the flows on some subsets of arcs. An exact cutting plane algorithm is presented for solving both of the above cases and some computational results are reported. © 2004 Wiley Periodicals, Inc.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.