Abstract
This paper focuses on the tube processing context in steel tube production and constructs a flexible job-shop scheduling problem (FJSP) model with consideration of the typical features and constraints. An evolutionary neighborhood search algorithm which consists of process consolidation (PC) strategy, production line adjustment (LA) strategy and elimination mechanism (EM) strategy is proposed. The computational tests show that the proposed algorithm has good performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.