Abstract

This paper focuses on the tube processing context in steel tube production and constructs a flexible job-shop scheduling problem (FJSP) model with consideration of the typical features and constraints. An evolutionary neighborhood search algorithm which consists of process consolidation (PC) strategy, production line adjustment (LA) strategy and elimination mechanism (EM) strategy is proposed. The computational tests show that the proposed algorithm has good performance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call