Abstract

A variety of specification methodologies have been proposed for integrating Continuous Compaction Control (CCC) measurements into existing quality assurance and quality control (QA/QC) protocols. This paper explores the use of alternative compaction specification approaches for performing QA/QC of compacted soils for embankment construction, using data collected during a field study where CCC equipment was used to construct a small embankment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call