Abstract

In this paper, an EPQ model for delayed deteriorating items is developed where the demand before deterioration sets in is assumed to be different from that after deterioration sets in. There are three stages for the inventory system as follows: 1) the production build-up stage (0 ≤ t ≤ L1); 2) stage before deterioration sets in (L1 ≤ t ≤ L2); 3) stage after deterioration sets in (L3 ≤ t ≤ L). It is also assumed that the unit cost of production is directly proportional to the process reliability and inversely proportional to the rate of demand and shortages are not allowed. A numerical example is given to illustrate the developed model and sensitivity analysis carried out on the example to see the effect of parameter changes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.