Abstract
Solving an integrated production and transportation problem (IPTP) is a very challenging task in semiconductor manufacturing with turnkey service. A wafer fabricator needs to coordinate with outsourcing factories in the processes including circuit probing testing, integrated circuit assembly, and final testing for buyers. The jobs are clustered by their product types, and they must be processed by groups of outsourcing factories in various stages in the manufacturing process. Furthermore, the job production cost depends on various product types and different outsourcing factories. Since the IPTP involves constraints on job clusters, job-cluster dependent production cost, factory setup cost, process capabilities, and transportation cost with multiple vehicles, it is very difficult to solve when the problem size becomes large. Therefore, heuristic tools may be necessary to solve the problem. In this paper, we first formulate the IPTP as a mixed integer linear programming problem to minimize the total production and transportation cost. An efficient genetic algorithm (GA) is proposed next to tackle the problem when it becomes too complicated. The objectives are to minimize total costs, where the costs include production cost and transportation cost, under the environment with backup capacities and multiple vehicles, and to determine an appropriate production and distribution plan. The results demonstrate that the proposed GA model is an effective and accurate tool.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.