Abstract

This paper deals with an agile manufacturing system with two stages where the first stage is the machining stage including a single flexible machine while the second stage is assembly stage including parallel identical assembly machines. Products have an assembly structure where their parts should be processed at the first stage and then proceed to the assembly stage. The goal is to find the parts sequence which minimizes makespan. Since the studied problem is NP-hard, enhanced intelligent water drops (EIWD) algorithm as a new swarm-based nature inspired optimization algorithm is proposed. Also, artificial immune system (AIS) algorithm has been proposed to tackle the addressed problem. Computational results based on randomly generated instances show the effectiveness of the proposed technique.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.