Abstract

We investigate the problem of constructing the maximal number of node disjoint paths between two distinct nodes in Swapped/OTIS networks. A general construction of node disjoint paths in any OTIS network with a connected basis network is presented, which is independent of any construction of node disjoint paths in its basis network. This general construction is effective and efficient, which can obtain desirable node disjoint paths of length at most D + 4 in O(Δ 2 + Δf(N 1/2)) time if the basis network of size n has a shortest routing algorithm of time complexity O(f(n)), where D, Δ and N are, respectively, the diameter, the degree and the size of the OTIS network. Further, for OTIS networks with maximally fault tolerant basis networks, we give an improved version of a conventional construction of node disjoint paths by incorporating the above general construction. Finally, we show the effectiveness and efficiency of these constructions applied to OTIS-Hypercubes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.