Abstract

We consider a semi-online multiprocessor scheduling problem with a given a set of identical machines and a sequence of jobs, the sum of whose processing times is known in advance. The jobs are to be assigned online to one of the machines and the objective is to minimize the makespan. The best known algorithm for this problem achieves a competitive ratio 1.6 (Cheng et al. in Theor Comput Sci 337:134---146, 2005). The best known lower bound is approximately 1.585 (Albers and Hellwig in Theor Comput Sci 443:1---9, 2012) if the number of machines tends to infinity. We present an elementary algorithm with competitive ratio equal to this lower bound. Thus, the algorithm is best possible if the number of machines tends to infinity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.