Abstract
We study the problem of scheduling unit execution time jobs with release dates and precedence constraints on two identical processors. We say that a schedule is ideal if it minimizes both maximum and total completion time simultaneously. We give an instance of the problem where the min-max completion time is exceeded in every preemptive schedule that minimizes total completion time for that instance, even if the precedence constraints form an intree. This proves that ideal schedules do not exist in general when preemptions are allowed. On the other hand, we prove that, when preemptions are not allowed, then ideal schedules do exist for general precedence constraints, and we provide an algorithm for finding ideal schedules in O(n 3) time, where n is the number of jobs. In finding such ideal schedules we resolve a conjecture of Baptiste and Timkovsky (Math. Methods Oper. Res. 60(1):145–153, 2004) Further, our algorithm for finding min-max completion-time schedules requires only O(n 3) time, while the most efficient solution to date has required O(n 9) time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.