Abstract

This paper show that fuzzy set theory can be useful in modelling and solving flow shop scheduling problems with uncertain processing times and illustrates a methodology for solving job sequencing problem which the opinions of experts greatly disagree in each processing time. Triangular fuzzy numbers (TFNs) are used to represent the processing times of experts. And the comparison methods based on the dominance property is sued to determine the ranking of the fuzzy numbers. By the dominance criteria, for each job, a major TFN and a minor TFN are selected and a pessimistic sequence with major TFNs and an optimistic sequence with minor TFNs are computer. Branch and bound algorithm for makespan in three-machine flow shop is utilized to illustrate the proposed methodology.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.