Abstract

This study addresses flexible job shop scheduling problem (FJSP) with fuzzy processing time. The fuzzy or uncertainty of processing time is one of seven characteristics in remanufacturing. A discrete harmony search (DHS) algorithm is proposed for FJSP with fuzzy processing time. The objective is to minimise maximum fuzzy completion time. A simple and effective heuristic rule is proposed to initialise harmony population. Extensive computational experiments are carried out using five benchmark cases with eight instances from remanufacturing. The proposed heuristic rule is evaluated using five benchmark cases. The proposed DHS algorithm is compared to six metaheuristics. The results and comparisons show the effectiveness and efficiency of DHS for solving FJSP with fuzzy processing time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.