Abstract
In recent years, many researches on economic production quantity (EPQ) models with machine breakdown and preventive maintenance have been developed, but few of them have developed integrated models for deteriorating items. In this study, we develop EPQ models for deteriorating items with preventive maintenance, random machine breakdown and immediate corrective action. Corrective and preventive maintenance times are assumed to be stochastic and the unfulfilled demands are lost sales. Two EPQ models of uniform distribution and exponential distribution of corrective and maintenance times are developed. An example and sensitivity analysis is given to illustrate the models. For the exponential distribution model, it is shown that the corrective time parameter is one of the most sensitive parameters to the optimal total cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: International Journal of Systems Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.