Abstract

In this paper an economic comparison between using FACTS devices and demand response programs implementation for the enhancement of available transmission capacity is addressed. In order to reach to this target first, direct load control program, as the most common demand response program, is considered. Then, enhancement of ATC by using of TCSC, shunt capacitor and shunt reactor is investigated. Finally, an economic analysis for the above ATC enhancement resources is performed and an economic feasibility study is conducted. The proposed method is evaluated by numerical studies based on IEEE 30-bus test system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.