Abstract

Excavations on Jerusalem’s Southeastern Ridge, in the GivꜤati Parking Lot excavations, have exposed a man-made ditch, some 30 m wide and at least 6 m in depth, close to the hill’s summit. This paper presents the technical features of the ditch, including the rock scarps that delineate it from the north and south, as well as an enigmatic installation composed of a series of intertwined channels. Through comparison with data from previous excavations farther east, it is clear that this ditch traversed the entire width of the ridge, creating a disconnect between the Southeastern Ridge and the Ophel. Although the initial cutting of the ditch cannot be determined, it is clear that by the Late Iron IIA, the ditch served as a moat between the acropolis—possibly including the Temple Mount—and the city. This continued until the Late Hellenistic period, when construction activities backfilled the ditch, leading to its disappearance from the cityscape.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.